​​​​​Dubai Water Canal

Year                 2014
Location          Dubai, U.A.E.
End User         RTA
Contractor      Gunal & Mapa, CSCEC, Besix


Design and technical support of water transmission and  irrigation systems for the newly constructed Dubai Canal sizes DN 300 mm to DN 1,200 mm.

Infrastructure & Municipal

CLIENT CERTIFICATES

​​​​​​​​​​Egyptian Linear Alkyl Benzene Project (ELAB)

Year                 2009
Location          Egypt
End User         ELAB
Contractor      GS Eng.


Project management, installation, testing, and commissioning of GRE water lines sizes DN 80 mm to DN 600 mm.

Sigma Composites Senior Staff have more than 40 years of combined and diversified experience in the field of composite piping design, manufacturing, testing, and installation.


Our experience includes projects executed with major End Users and global EPCs in the GCC, Middle East, and North Africa.

Industrial

​​​​​​​​​South Sinai Water Disposal Wells

Year                 2012
Location          Egypt
End User         ENI
Contractor      Petrojet


Project and supply chain management as well as installation of GRE effluent water line size DN 600 mm in the South Sinai desert.

​​​​​​Palm Jumeirah Water Line

Year                 2013
Location          Dubai, U.A.E.
End User         Nakheel
Contractor      Target & Jima Construction


Design and technical support of water transmission lines sizes DN 450 mm to DN 900 mm installed in the tunnel.

​​​​​​​​​​Sorfert Fertilizer Plant

Year                 2009
Location          Algeria
End User         Sorfert
Contractor      ORASCOM


Project management, prefabrication, installation, and testing of GRP intake & outfall and GRE discharge header lines sizes DN 600 mm to DN 1,200 mm.

​​​​​​​Damietta Power Plant

Year                 2013
Location          Egypt
End User         EDEPC
Contractor      Hyundai


Project management, prefabrication, installation, and testing of GRE water lines sizes DN 100 mm to DN 600 mm.

​​​​​​FPSO Cyrus - Seawater Skids

Year                 2016 - 2017
Location          Dubai, U.A.E.
End User         A&T
Contractor      Nash Engineering


Prefabrication and installation of Seawater GRE piping services sizes DN 25 mm to  DN 750 mm (1" to 30").

​​​​​​​​FPSO Cyrus - Topside Modules

Year                 2016 - 2017
Location          Dubai, U.A.E.
End User         A&T
Contractor      DryDocks World


Engineering, stress analysis, prefabrication, and installation of GRE Topside piping modules sizes DN 25 mm to DN 750 mm (1" to 30").

​​​​​​​​​​ASAB Field Development

Year                 2016
Location          Abu Dhabi, U.A.E.
End User         ADCO
Contractor      Petrofac/Petromen


GRE Prefabrication and installation of the 2" and 4" lines.

MARINE & OFFSHORE

​​​​​​BorWin3 Wind Power Platform - Germany

Year                 2017
Location          Dubai, U.A.E.
End User         Tennet
Contractor      Petrofac & DryDocks World


Prefabrication and installation supervision of various GRE piping services sizes DN 25 mm to DN 400 mm (1" to 16").

Oil & Gas

​​​​​​​​​Misurata Combined Cycle Power Plant

Year                 2010
Location          Libya
End User         GECOL
Contractor      Daewoo E&C


Prefabrication, installation, and testing of GRP intake & outfall, seawater cooling, GRV sanitary, and GRE fire water systems sizes DN 80 mm to DN 2,400 mm.

​​​​​​​Wad Hamid Agriculture Project

Year                 2014
Location          Sudan
End User         GLB Invest
Contractor      Al-Moatasem Contracting


Installation, testing, and commissioning of 42 km of GRP transmission pipeline and distribution network sizes DN 300 mm to DN 1,200 mm.​